DSTA - Mandai Quarry Main
Phase Project (2002 - 2004)
- Supply, installation, testing & commissioning of rock
tunnel monitoring instruments
- Multipoint borehole extensometers (with LVDTs) and instrumented
soil nail
|
 |
|
|
Savannah Condopark Residential Development
at Simei Rise (2003 - 2004)
Geotechnical instrumentation monitoring and plate load tests
for basement works.
|
 |
|
|
D’Lotus Residential Development
at Lorong Ampas (2005 - 2006)
Geotechnical instrumentation monitoring. |
 |
|
|
The Sail at Marina Residential Development
(2005 - 2006)
- Geotechnical instrumentation monitoring for 12m deep excavation
above operating MRT tunnels
- Additional soil investigation works
|
 |
|
|
The Blossom Residential Development
at Woodledge Close (2005 - 2006)
Geotechnical instrumentation monitoring. |
 |
|
|
Geological and rock investigation
for subsea oil/gas storage rock caverns at Jurong Island (2004)
Marine seismic survey, land seismic survey, downhole geophysical
logging, in-situ stress measurement, Horizontal Directional
Drilling (HDD), large-scale hydrogeologic field testing, laboratory
tests. |
 |
|
|
Supply, Installaltion, Maintenance
and Monitoring of Instrumentation Equipments for LTA’s
CCL 4 &5 Contract C856 (2005 - 2008)
The first direct instrumentation contract from LTA –
after match of Nicoll Highway Incident. |
 |